ANALISA SINKRONISASI ALAT GALI MUAT DAN ALAT ANGKUT TERHADAP REALISASI PRODUKSI OVERBURDEN DI PT DUTA ALAM SUMATERA

Authors

  • Kemas Moh. Ade Isnaeni Program Studi Teknik Pertambangan Batubara Politeknik Akamigas Palembang, 30257, Indonesia
  • Anugrah Jodi Pratama Program Studi Teknik Pertambangan Batubara Politeknik Akamigas Palembang, 30257, Indonesia
  • Muhammad Ali Malik Program Studi Teknik Pertambangan Batubara Politeknik Akamigas Palembang, 30257, Indonesia

DOI:

https://doi.org/10.53625/jirk.v2i12.5673

Keywords:

Overburden, Match Factor

Abstract

The mining activities at PT Cahaya Riau Mandiri jobsite PT Duta Alam Sumatera applied conventional mining method, namely using the combination of loading and hauling equipment. The mining activity for overburden removal at PT Duta Alam Sumatera had equipment synchronization of MF >1 where the loading equipment had waiting time. To obtain the synchronized time, the reduction of hauling tools was necessary so that production activities especially overburden hauling could run optimally without any waiting time. The use of need equipment especially on the overburden activity utilized 5 units of DT Nissan CWB 45 and 1 unit of Komatsu PC 400 loading tool. Fleet 1 had production of 118.21 BCM/hours with match factor 1.46. Fleet 2 had production of 111.13 BCM/hours with match factor 1.52. Fleet 3 had production of 113.70 BCM/hours with match factor 1.46. The number of hauling tool could accelerate the mining activities without any waiting time from the almost close match factor

References

Darmansya, N. 1998. Pemindahan Tanah Mekanis Dan Alat Berat.Sumatera Selatan: Jurusan Teknik Sipil, Universitas Sriwijaya.

Indonesianto, Y. 2016. Pemindahan Tanah Mekanis. Yogyakarta: Sekolah Tinggi Teknologi Nasional.

Prodjosumarto, Partanto. 1995. Pemindahan Tanah Mekanis. Bandung: Institut Teknologi Bandung.

Rochmanhadi. 1982. Alat-alat berat dan penggunaanya. Jakarta: Badan Penerbit Pekerja Umum.

Tenriajeng, Andi Tenrisukki. 2003. Pemiindahan Tanah Mekanis. Jakarta: Gunadarma.

Zulkarnain, Fahrizal. 2020. Pemindahan Tanah Mekanis dan Peralatan Konstruksi. Medan: UMSU Press.

Downloads

Published

2023-05-27

How to Cite

Isnaeni, K. M. A., Anugrah Jodi Pratama, & Muhammad Ali Malik. (2023). ANALISA SINKRONISASI ALAT GALI MUAT DAN ALAT ANGKUT TERHADAP REALISASI PRODUKSI OVERBURDEN DI PT DUTA ALAM SUMATERA. Journal of Innovation Research and Knowledge, 2(12), 4613–4622. https://doi.org/10.53625/jirk.v2i12.5673

Issue

Section

Articles