PENJADWALAN PROYEK EFO (EXPORTABLE FINE ORE) PADA INDUSTRI PERTAMBANGAN

Authors

  • Anita Anita Jurusan Teknik Industri, Fakultas Teknologi Industri, Universitas Gunadarma

DOI:

https://doi.org/10.53625/jcijurnalcakrawalailmiah.v2i11.6248

Keywords:

Project Scheduling, Mining, EFO

Abstract

Project scheduling is the activity of determining the timeframe for project activities to be completed, raw materials, labor and time needed by each activity. PT. Ifishdeco Tbk. is a private company engaged in the mining of raw nickel ore, which includes exploration, development and sale of nickel ore. This study aims to study the scheduling of EFO (Exportable Fine Ore) projects. There is a difference in the project scheduling between plan and realization, namely for the plan it is estimated to be completed in 30 days but in the implementation of the project realization it is completed within 79 days, so the project experiences a time difference between plan and realization which is 49 days. Delays in working on projects can be due to delays in material delivery and weather factors

References

Alamsyah, H. J. (2019). Evaluasi Penjadwalan Proyek Pembangunan Rumah Dinas Perawat Dan Bidan Di Kabupaten Karimun dengan Metode Critical Path Method (CPM) dan Program Evaluation and Review Technique (PERT) (Doctoral dissertation, Universitas Islam Negeri Sultan Syarif Kasim Riau).

Ardiansyah, L. R. (2018). Penjadwalan Flowshop Untuk Meminimasi Total Tardiness Menggunakan Metode Cross Entropy Genetic Algorithm Studi kasus: CV. Star Perdana Teknik (Doctoral dissertation, University of Muhammadiyah Malang).

Ayuputri, A. (2018). Analisis Pengendalian Proses Produksi Untuk Meningkatkan Kualitas Gula Pada PTP XIV Nusantara Takalar Di Kabupaten Takalar (Doctoral dissertation, Universitas Muhammadiyah Makassar).

Dewi, S. T. (2020). Perencanaan Penjadwalan Pekerjaan Struktur Menggunakan Kombinasi Metode PERT Dan PDM (Studi Kasus: Proyek Pembangunan Gedung DLC UGM) (Doctoral dissertation, Universitas Islam Indonesia).

Guna, I. T. (2019). Analisis Biaya dan Waktu Menggunakan Metode EVM (EARNED VALUE METHOD) Pada Proyek Konstruksi (Studi Kasus Pada Proyek Konstruksi Supermall Pakuwon Indah Phase 4 Anderson Surabaya) (Doctoral dissertation, UNIVERSITAS 17 AGUSTUS 1945).

Heriyana, H. (2020). Pengendalian Persediaan Dan Proses Produksi Pengaruhnya Terhadap Kualitas Produk Di Ukm Karya Abadi Prabumulih. Integritas Jurnal Manajemen Profesional (IJMPRO), 1(2), 119-130.

Herlina, E., Prabowo, F. H. E., & Nuraida, D. (2021). Analisis Pengendalian Mutu Dalam Meningkatkan Proses Produksi. Jurnal Fokus Manajemen Bisnis, 11(2), 173-188.

Kevin, Y. (2019). Analisa Penjadwalan Proyek Pembangunan Gedung ICS/UPI Pada PT. Titian Karya Mandiri (Doctoral dissertation, Universitas Mercu Buana).

Rafsanjani, S. Y. H. (2019). Analisa Pemerataan Sumber Daya Tenaga Kerja Menggunakan Metode Burgess Pada Pembangunan Proyek Hotel Neo Batu (Doctoral dissertation, University of Muhammadiyah Malang).

Suherman, S. (2016). Analisa Penjadwalan Proyek Menggunakan PDM dan Pert Serta Crash Project (Studi kasus: Pembangunan Gedung Main Power House PT. Adhi Karya). J. Tek. lnd. J. Has. PeneIit. Dan Karya IIm. DaIam Bid. Tek. lnd.

Sukarno, P. S. (2017). LKP: Rancang Bangun Company Profile Berbasis Web pada Instansi Pemerintahan Desa Padusan (Doctoral dissertation, Institut Bisnis dan Informatika Stikom Surabaya).

Susanti, A. (2019). Pengaruh Struktur Organisasi Dan Budaya Organisasi Terhadap Kualitas Sistem Informasi Akuntansi (Survey Pada Perguruan Tinggi Di Wilayah Kota Bandung) (Doctoral dissertation, Universitas Komputer Indonesia).

Tauhid, M. F., Nurcahyo, R., & Farizal. (2019). Optimasi Penjadwalan Kelas Kepemimpinan di Lembaga Non Universitas Menggunakan Algoritma Genetika. A08.1-7.

Wibowo, H., & Septiana, E. (2017). Penjadwalan Produksi Crude Palm Oil (CPO) Dan Kernel Pada Mesin Digester Dengan Menggunakan Metode Indikator (Studi Kasus: PT. Kresna Duta Agroindo, Jambi). Prosiding SENIATI, E36-1.

Widhoretno, N. (2019). Evaluasi Penjadwalan Proyek Gedung Perpustakaan Pada CV. Nadia Pratama (Doctoral dissertation, University of Muhammadiyah Malang).

Wohon, F. Y., Mandagi, R. J., & Pratasis, P. (2015). Analisa Pengaruh Percepatan Durasi Pada Biaya Proyek Menggunakan Program Microsoft Project 2013 (Studi Kasus: Pembangunan Gereja GMIM Syaloom Karombasan). Jurnal Sipil Statik, 3(2).

Downloads

Published

27-07-2023

How to Cite

Anita, A. (2023). PENJADWALAN PROYEK EFO (EXPORTABLE FINE ORE) PADA INDUSTRI PERTAMBANGAN. Jurnal Cakrawala Ilmiah, 2(11), 4447–4460. https://doi.org/10.53625/jcijurnalcakrawalailmiah.v2i11.6248

Issue

Section

Articles